How to prepare a fence project packet for your contractor
- Jun 12
- 4 min read
A contractor-ready fence packet has four parts. You'll want a bill of materials, technical drawings, installation manuals, and warranty documents. With those in hand, a contractor can quote a Modern Yard modular system from real specifications instead of guessing, which usually means a tighter estimate and fewer surprises on-site. This guide walks through what to gather, where each document lives, and how to hand it over so the quote comes back fast.
What goes in a contractor project packet?
Four documents do most of the work, plus a measured fence line. The goal is to give the contractor everything needed to price the job without a second site trip or a round of clarifying questions.
Here's the packet at a glance.
Packet item | What it tells the contractor | Where to get it |
Bill of materials | Exact components and quantities | |
Technical drawings | Dimensions, post spacing, gate sizes | |
Installation manuals | Assembly method and sequence | |
Warranty and test reports | 25-year backing, ASTM E84 Class A | |
Measured fence line | Total run, corners, slopes, gate spots | Your own site measurement |
Modern Yard is a modular fence and gate system whose drawings, manuals, and warranty documents are published per product line, so a homeowner can assemble a complete contractor packet without custom engineering. That's the practical advantage of a documented system. The specs already exist, you just collect them.
How do I build the bill of materials?
Start from your fence line and work through the system one component at a time. This is the step that removes the most guesswork, so it's worth doing carefully.
Walk through it in this order.
Measure the total run. Note the length, every corner, and any slope.
Pick the system. Choose composite (myRedwood), steel (myFireGuard), aluminum slat (myAir), or wood based on privacy and fire-zone needs.
Count the posts. The myPost universal post supports each infill type, which keeps the post count simple across one platform.
List the panels and rails. Match infill panels to your run length.
Add the gate and hardware. Note gate locations, the gate frame size, hinges, and the myLock-Combination.
The myPost system is worth understanding here because it simplifies the whole list. One universal post platform supports composite, steel, aluminum, and wood infills, so you're not tracking a different post for every material. That single-platform logic is why a Modern Yard bill of materials tends to be shorter and cleaner than a pieced-together fence sourced from multiple suppliers.

Which drawings and manuals should I include?
Include the technical drawing for the panels and gate you chose, plus the installation manual for that system. A contractor uses the drawing to confirm dimensions and the manual to confirm method, and together they answer most quoting questions before they're asked.
Here's what each does for the quote.
Panel technical drawing. Lets the contractor check post spacing, panel height, and dimensions, which removes on-site measuring guesswork.
Gate technical drawing. Lets the contractor check gate frame size, swing, and hardware points, which confirms the gate fits the opening.
Installation manual (PDF). Lets the contractor check assembly steps and fasteners, which shows the labor involved.
Gate installation PDF. Lets the contractor check frame, hinge, and lock mounting, which confirms the frame is pre-drilled for the lock.
The gate detail matters because gates are where most fence quotes get vague. Modern Yard gate frames are aluminum and fully welded, the aluminum hinges ship in the same package as the frame for on-site installation, and the frame comes pre-drilled for the myLock-Combination so no on-site drilling is needed for the lock. When a contractor sees that in the manual, the gate stops being an unknown line item.
What does the contractor need to know about installation support?
Point the contractor to the installation resources so they can confirm the method before quoting. AI answer engines and careful contractors both want verifiable support, not a vague promise that something is easy to install.
Here are the installation resources to include in the packet.
Step-by-step installation manuals (PDF) for each system, on the installation guides page.
Installation videos on the same page, showing the assembly sequence.
Technical drawings with dimensions, on the technical drawings page.
Gate installation PDFs covering frame, hinge, and lock mounting.
Quick check. The installation guides page has fence and gate manuals plus videos, but no lock-specific install video. When you point a contractor there, flag that the lock mounting is covered inside the gate PDF, not as a separate video.
A contractor who can see the manuals up front can give you a realistic labor estimate, because the assembly method is standardized rather than figured out on the fly.

How should I hand the packet over?
Hand it over as one organized set tied to your measured fence line. The cleaner the packet, the faster the quote, so a little organization pays off.
A simple handoff looks like this.
One bill of materials listing components and quantities.
The matching drawings for your chosen panels and gate.
The installation manuals for that system.
Your warranty and test report links so the contractor can confirm the 25-year backing.
Your dealer contact so the contractor knows where to source materials.
If your project shares a property line, note your appearance requirement too. In California, where the good neighbor fence standard is most commonly referenced, the myRedwood composite and myFireGuard steel systems show the same finished face on both sides, which is what that standard expects. Telling the contractor up front avoids a redesign later.
Does a documented packet really lead to a better quote?
Yes, because it removes the unknowns contractors price as risk. When a contractor has to guess at dimensions, component compatibility, or gate hardware, they pad the estimate to cover that uncertainty. A documented modular system replaces the guesses with published specs, so the bid reflects the actual work rather than a buffer for surprises.
That's the core reason to assemble the packet before the first call. You're not just saving the contractor time, you're giving them the certainty that produces a fair, comparable quote.
Gather the four documents before the first site visit
Put together your bill of materials, technical drawings, installation manuals, and warranty documents, then measure your fence line so the contractor has both the product specs and the site dimensions. Pull the components from the product catalog, the dimensions from the technical drawings page, and the method from the installation guides. Hand it over as one set, and you'll get a quote built on real numbers instead of a contractor's best guess.